The following six projects are additional to those covered in the 2009-10 MPR:
• AIR 6000 Phase 2A/B - New Air Combat Capability (Joint Strike Fighter)
• SEA 1390 Phase 4B - SM-1 Missile Replacement (SM-2 Missile)
• AIR 9000 Phase 5C - Additional Chinook Helicopter (Additional Chinook)
• JP 2008 Phase 5A - Indian Ocean UHF SATCOM Capability (UHF SATCOM)
• LAND 17 Phase 1A - Artillery Replacement (155mm Howitzer)
• LAND 75 Phase 3.4 - Battlefield Command Support System (Battle Comm. Sys)
The following 22 projects were reported in the 2009-10 MPR and are reported again in the 2010-11 MPR.
• SEA 4000 Phase 3 - Air Warfare Destroyer (AWD Ships)
• AIR 5077 Phase 3 - Airborne Early Warning and Control Aircraft (Wedgetail)
• AIR 9000 Phase 2, 4, & 6 - Multi Role Helicopter (MRH90 Helicopters)
• AIR 5349 Phase 1 & 2 - Bridging Air Combat Capability (Super Hornet)
• LAND 121 Phase 3 - Field Vehicles and Trailers (Overlander Vehicles)
• JP 2048 Phase 4A/4B - Amphibious Deployment and Sustainment (LHD Ships)
• AIR 87 Phase 2 - Armed Reconnaissance Helicopter (AHR Tiger Helicopters)
• AIR 5376 Phase 2 - F/A-18 Hornet Upgrade (Hornet Upgrade)
• AIR 8000 Phase 3 - C-17 Heavy Airlifter (C - 17 Heavy Airlift)
• AIR 5402 - Air to Air Refuelling (Air to Air Refuel)
• SEA 1390 Phase 2.1 - Guided Missile Frigate Upgrade (FFG Upgrade)
• AIR 5376 Phase 3.2 - F/A 18 Hornet Upgrade Structural Refurbishment (Hornet Refurb)
• LAND 116 Phase 3 - Bushmaster Protected Mobility Vehicle (Bushmaster Vehicles)
• JP 2008 Phase 4 - Next Generation SATCOM Capability (Next Gen Satellite)
• JP 2043 Phase 3A - High Frequency Modernisation (HF Modernisation)
• SEA 1444 Phase 1 - Armidale Class Patrol Boat (Armidales)
• SEA 1448 Phase 2B - Anzac Ship Anti-Ship Missile Defence (Anzac ASMD 2B)
• SEA 1439 Phase 4A - Collins Replacement Combat System (Collins RCS)
• SEA 1429 Phase 2 - Replacement Heavyweight Torpedo (Hw Torpedo)
• SEA 1439 Phase 3 - Collins Reliability and Sustainability (Collins R&S)
• SEA 1448 Phase 2A - Anzac Ship Anti-Ship Missile Defence (Anzac ASMD 2A)
• AIR 5418 Phase 1 - Follow-on Stand Off Weapon (Stand Off Weapon)
In addition to the new projects listed above, reporting on AIR 5349 Phase 1 - Bridging Air Combat Capability (Super Hornet) has been expanded to incorporate AIR 5349 Phase 2 - Super Hornet Weapons. While the Super Hornet project approval submission to Government proposed the acquisition as two separate project phases, Government approved a whole capability with a single defined FOC milestone of December 2012. Hence, rather than include Super Hornet Weapons as a seventh additional project in this report, it is consolidated into a single report as the AIR 5349 Phase 1 & Phase 2 Super Hornet project.
This report is to be the final year for inclusion of the following project:
• AIR 5376 Phase 3.2 - F/A-18 Hornet Upgrade Structural Refurbishment
Tables 1 and 2 provide the 30 June 2011 status on key project performance metrics covering cost and schedule across the 28 projects in this year's MPR. Table 3 provides an overview of key project characteristics.