| Phase 2.1 | Cost Performance |
| The Project was completed within budget. | |
| Schedule Performance | |
| The Project was completed ahead of schedule. | |
| Capability Performance | |
| Capability has been accepted into service. | |
| Phase 2.2 | Cost Performance |
| The Project has achieved Technical and Contractual Completion within budget. | |
| Schedule Performance | |
| All Hornet aircraft have been accepted within schedule. | |
| Capability Performance | |
| Capability has been accepted into service. | |
| Phase 2.3 | Cost Performance |
| The Project remains within budget. | |
| Schedule Performance | |
| Initial Materiel Release (IMR) providing an interim Electronic Warfare capability was delivered on schedule. Major elements of Materiel Release 2 are now in place to support Initial Operational Capability (IOC). Additionally, significant progress has been made with the elements of Final Materiel Release (FMR) to support Final Operational Capability (FOC). | |
| Capability Performance | |
| The radar warning receiver and data recorder elements have demonstrated their fitness for purpose and have been released for service. Acceptance and operational test and evaluation for the BOL-518 Counter Measures Dispenser System and the EL/L-8222 Electronic Counter Measures (ECM) pods indicates that these systems are also fit for purpose. | |
| Cost Performance | |
| The project remains within budget. | |
| Schedule Performance | |
| HACTS has delivered Initial Operational Capability. | |
| Capability Performance | |
| Ongoing upgrades are required to Hornet Aircrew Training System (HACTS) to introduce emerging Hornet capabilities being introduced by other Hornet and Weapon upgrades. | |