| Pie Chart: Percentage Breakdown of Materiel Capability Performance | |
|
| Green: The project is currently meeting materiel capability requirements. These include, but are not limited to: • Safely and effectively refuelling aircraft equipped with pod hose and drogue compatible refuelling systems; • Ability to accept military and civil pallets and bulk cargo; • Suitable military and civil communication and navigation suites; and • Aircraft and through life support system capable of sustaining prescribed annual rate of effort. |
| Amber: There is risk to meeting all materiel capability requirements for FOC due to acceptance of aircraft in an initial configuration and the risk of successful remediation of all non-conformances and improvements to the Aerial Refuelling Boom System. | |
| Red: N/A | |