Project | Description of Project | Description of Dependency |
SEA 1390 PH 2.1 FFG Guided Missile Frigate Upgrade Implementation | Upgrade FFG Anti-Ship Missile defence, air search radar and missile fire control system/radars, Underwater Warfare, Electronic Support and other ship systems, Data Link, ship and shore based Training Systems and establish a Warfare Systems Support Centre. | The upgraded FFG combat system developed under SEA 1390 Phase 2.1 was a necessary precursor and baseline for the development of the SM-2 capability. The upgraded FFG combat system was developed and delivered progressively as three successive (software) baseline builds and the completion of Baseline Build 2 was necessary for the further development of the SM-2 capability to be completed under SEA 1390 Phase 4B. |
Purchase of the Mk698 Test Set for logistic support and all up round depot level maintenance of the SM-2. | Project SEA 1390 Phase 4A is another discrete phase of the SEA 1390 FFG Upgrade Project and is directly linked to the SM-2 capability. This phase acquired, installed and set-to-work a Mk 698 Mod 0 Guided Missile Test Set necessary to support the re-certification, maintenance and repair of the SM-2 Block IIIA missiles. |