Contractor | Signature Date | Price (Base) at | Type (Price Basis) | Form of Contract | Notes | |||
Signature $m | 30 Jun 11 $m | |||||||
BAE Systems Australia | Jul 05 | 2.1 | 57.7 | Variable | Alliance |
| ||
SAAB Systems Pty Ltd | Jul 05 | 3.1 | 67.0 | Variable | Alliance |
| ||
CEA Technologies P3 Contract | Dec 05 | 8.9 | 69.6 | Variable |
| |||
CEA Technologies PAR Production Contract | Dec 08 | 16.0 | 109.6 | Variable |
| |||
Interrupted Continuous Wave Illumination (ICWI) Membership | Nov 08 | 20.9 | 20.9 | n/a |
|
| ||
Contractor | Quantities as at | Scope | Notes | |||||
Signature | 30 Jun 11 | |||||||
BAE Systems Australia | - | 2 | Ship 1 and land based test system |
| ||||
SAAB Systems Pty Ltd | - | 2 | Ship 1 and land based test system. |
| ||||
CEA Technologies P3 Contract | 2 | 2 | Phased array radar systems for Ship 1 and land based test system | 1 | ||||
CEA Technologies PAR Production Contract | 1 | 2 | Phased array radar systems for Ship 1 and land based test system | 2 | ||||
Interrupted Continuous Wave Illumination (ICWI) Membership | - | - | Technical documentation and Intellectual Property for use with the Evolved Seasparrow Missile |
| ||||
Major equipment received and quantities to 30 Jun 11 | ||||||||
Most Critical/Detailed (PAR) Design Reviews have been completed. | ||||||||
Notes | ||||||||
1 | (P3 = Preliminary Phased Array Radar Program); This contract was officially closed in April 2010 and was aimed at development and initial production of the first phased array radar system. | |||||||
2 | This is the current production contract for the delivery of the first phased array radar system into HMAS Perth (lead ship). This contract is a single ship contract in accordance with the revised acquisition strategy, but has options that can be activated by the Commonwealth for an additional seven ship sets builds if Government approves this post successful at sea testing of the lead ship. In order to manage acquisition obsolescence of phased array radar components and retention of the strategic workforce related to the phased array radar, this contract also includes forward component buys. | |||||||