4.1 Measures of Materiel Capability Performance

Pie Chart: Percentage Breakdown of Materiel Capability Performance

Green:

CAT5 sea trials for CS04 completed in July 2009. CS04 installed in WALLER and FARNCOMB. CS05 installed and CAT 5 sea trials have been completed with full analysis completed in August 2010.

Amber:

N/A

Red:

N/A