Pie Chart: Percentage Breakdown of Materiel Capability Performance | |
| Green: CAT5 sea trials for CS04 completed in July 2009. CS04 installed in WALLER and FARNCOMB. CS05 installed and CAT 5 sea trials have been completed with full analysis completed in August 2010. |
Amber: N/A | |
Red: N/A | |