Maturity Score | Attributes | Total | ||||||||
Schedule | Cost | Requirement | Technical Understanding | Technical Difficulty | Commercial | Operations and Support | ||||
Project Stage | Benchmark | 8 | 8 | 8 | 8 | 9 | 8 | 8 | 57 | |
Acceptance Testing | Project Status | 8 | 8 | 9 | 8 | 8 | 8 | 9 | 58 | |
Explanation | • Requirement: System integration and testing processes have verified the platform modification requirements and those modifications apply to later Spiral baselines. The APB 4 baseline has also been accepted for IOR. Therefore, the assessment score is marginally ahead of the benchmark score for this particular maturity gate. • Technical Difficulty: Spiral 1 software had been granted OR; APB 4 software is still under development and testing. Although there is high confidence that all technical issues will be solved it is appropriate to retain the maturity assessment against this attribute at the lower level at this time. • Operations and Support: APB 4 software has been granted Initial OR and has entered into operational testing. Therefore the maturity score is marginally ahead of the benchmark score for this particular maturity grade. | |||||||||
| ||||||||||