Project | Description of Project | Description of Dependency |
SEA 1439 Phase 4A | Replacement Combat System | SEA 1439 Phase 3 have provided Global Positioning Systems (GPS) to SEA 1439 Ph 4A for installation with each Replacement Combat System (RCS) implementation. |
SEA 1446 Phase 1 | Interim Minimum Operating Capability | SEA 1446 Phase 1 supplied approved and verified fast track platform designs for implementation into four submarines. |