4.1 Measures of Materiel Capability Performance

Pie Chart: Percentage Breakdown of Materiel Capability Performance

Green:

Based on lead ship (HMAS Perth) successful acceptance testing and initial materiel certification being achieved in Jun 2011, the Project is currently meeting capability requirements as expressed in the suite of Capability Definition Documentation and in accordance with the requirements of the relevant Technical Regulatory Authorities.

Amber:

N/A

Red:

N/A