Test and Evaluation | Major System / Platform Variant | Original Planned | Current Planned | Achieved /Forecast | Variance (Months) | Notes | |
System Requirements | Sep-10 | Sep-10 | Sep-10 | 0 |
| ||
Preliminary Design Review | N/A | N/A |
| N/A |
| 1 | |
Critical Design Review | N/A | N/A |
| N/A |
| 2 | |
Notes | |||||||
1 | As both the LW155 and AFATDS are Off The Shelf (OTS) acquisitions, there is no Preliminary Design Review. | ||||||
2 | As both the LW155 and AFATDS are OTS acquisitions there is no Critical Design Review. | ||||||