Project | Description of Project | Description of Dependency |
JP 2072 Phase 1 Battlespace Communications System | This is a project to enhance communications for ADF land elements through the development of a holistic battlespace communications architecture for the land environment. | Communications radio solution and architectures that underpin the BGC3. |
Land 125 Phase 3A Soldier Combat System | This project will enhance communications for ADF soldiers through the development of a BMS Dismounted component. | Land 125 Phase 3A C4I sub-system will enable the ADF to streamline delivery of an integrated system for mounted and dismounted battle management. |
JP 5408 phase 2B Navigation Warfare | This project will incrementally implement the enhancements and replacements to the ADF's GPS equipment. | These navigational and timing GPS equipment form an integral component of the BGC3. |
Land 116 Phase 3 Bushranger | This project is providing protected land mobility to Army units and RAAF Airfield Defence Guards with the Bushmaster PMVs. | The Bushmaster PMV is one of the vehicle platforms identified for installation of the BMS. This is the highest priority vehicle for Land 75 Phase 3.4 project |
Land 121 Phase 3 Overlander | This project will acquire up to 1,200 unprotected lightweight/light vehicles, 2,400 protected medium/heavy vehicles, 2,800 trailers and 290 Bushmaster PMVs | The G-Wagon (lightweight/light vehicle) is one of the vehicle platforms identified for installation of the BMS. |
Land 106 M113 Upgrade | This project will upgrade the M113 APC fleet to provide significant enhancements in protection, lethality and mobility whilst also providing improved supportability. | The M113 APC is one of the vehicle platforms identified for installation of the BMS. |
Land 17 Phase 1B BMS-Fires and AFATDS | This project will deliver an enhanced indirect fire support system. | The BMS-Fires system of the 105mm Hammel Artillery Replacement and 155m Howitzer Artillery Replacement will need to exchange data with the BMS being acquired by the Land 75 Phase 3.4 project. |