General

1.1  The Contractor shall design and construct the Works in accordance with the relevant Method Statement to meet the requirements of PR1. 

1.2  The Contractor shall provide Works appropriate for it to accept all Contract Waste and to process such Contract Waste to meet PR3.  

1.3  As a minimum, the Works shall meet the Works Quality Standards included in Appendix A.