Site(s) Access & Circulation

1.26  The Contractor shall design and construct the internal road and pedestrian area layout within the Site(s) to allow safe movement of vehicles and pedestrians and with regard to health and safety Legislation and Good Industry Practice.

1.27  The Contractor shall provide access to the Site(s) from the external road network.

1.28  The Contractor shall ensure the security of the Site(s) and allow the Authority safe and efficient access during the Opening Hours. This shall include but is not limited to:

i)    Suitable levels of artificial illumination for the purpose of ingress and egress from the Site(s), way finding and discharging Contract Waste;

ii)  Lighting to meet the requirements of:

a)  The Chartered Institution of Building Services Engineers (CIBSE) Lighting Guide; 

b)  The Institution of Lighting and Crime; and

iii)  Signage indicating access and egress.