As Built Drawings

1.51  The Contractor shall provide the Authority, a set of As-Built Drawings on the earlier of the date falling [ ] Business Days after the date they become available to the Contractor or within [  ] months after the date of issue of the Readiness Test Certificate in respect of the Facility.  