Design-Bid-Build

Design-bid-build ("DBB") is the traditional form of project delivery in which the design and construction of the facility are awarded separately to private sector engineering and contracting firms. As a result, the DBB process is divided into two separate phases for design and construction. In the design phase, the project sponsor either performs the work in-house or contracts with an engineering and design firm to prepare the preliminary engineering plans and environmental clearance, which typically results in a project plan at the 30 percent completion stage, and the final drawings and specifications for the project. Once the design phase is complete, the project sponsor separately contracts with a private construction firm through a competitive bidding process. Under a DBB delivery approach, the project sponsor, not the construction contractor, is solely responsible for the financing, operation, and maintenance of the facility and assumes the risk that the drawings and specifications are complete and free from error. The DBB selection process is based on negotiated terms with the most qualified firm for the design phase; while the award of the construction contract typically is based on the lowest responsible bid price. The majority of surface transportation projects, including most transit capital projects, currently use the DBB approach.