B12) Is there an emerging Core Strategy and/or DPD covering waste?
B13) If so, are the proposals consistent with the emerging Core Strategy and/or DPD?
B14) If so, are proposed sites and use allocated in the emerging Waste DPD, or have representations been made to seek to secure those allocations?
B15) Has appropriate input been made on behalf of the WDA to inform the development of the DPD and to ensure that the emerging DPD is informed by the MWMS?
B16) Detail any known objections (formal or otherwise) to the proposed allocations.
B17)
(i) Will planning permissions for the proposed sites be sought in advance of the adoption of the DPD including the allocation?
(ii) If so, has the potential objection of prematurity been considered? For example, are there sites proposed for allocation of which one or more of the chosen sites is/are not one?