Finally this paper presents, where possible, the most likely upper and lower bound values of optimism bias for each project type with respect to works duration, project duration, capital and operating expenditure and benefits shortfall. The study also provides an indication of critical project risk areas that must be mitigated to avoid high levels of optimism bias.