Determining and defining performance requirements

The following questions can provide a useful framework for determining and defining outputs/performance requirements:

•  What are the objectives of the facility and services to be provided?

•  How can these objectives contribute to the successful delivery of the program requirements?

•  In the light of these objectives, what is not acceptable (e.g. no off-site catering)?

•  What is negotiable (e.g. is IT one of the services provided or not)?

•  What is the level and standard of facilities and service that must be delivered (such as core space)?

•  What is desirable over that level and standard, if affordable (e.g. recreational space)?

•  What service parameters are non-discretionary (e.g. security levels)?

•  How do services and outputs rank in terms of functional criticality (i.e. where are the main risks)?

•  What is likely to change over the life of the contract and what are the potential drivers? How can such changes be allowed for in the specification, where necessary?

•  Is it possible to translate the specified standards into performance measures within the payment mechanism?