OBJECTIVE

In this part of the P3 business case, the project sponsor should:

•  Use costing information described in Step 2 as the basis for the PSC and Shadow Bid cash-flow models; and

•  Clearly articulate all key modeling assumptions that have been incorporated in to the models. Such assumptions include, but are not limited to: inflation, construction escalation, discount rates and timing of cash inflows and outflows.