OUTPUT SPECIFICATION EXAMPLE-WATER PROJECT

OUTPUT SPECIFICATION EXAMPLE-WATER PROJECT

WASTEWATER TREATMENT

The Service Company will be required to provide Services relating to the treatment of waste water from the defined catchment area.

SEWAGE SLUDGE

The Service Company will be required to treat and dispose of all sewage sludge generated as a result of the proposals for the treatment of waste water derived from the defined catchment.

STORM WATER OVERFLOWS

When developing solutions for storm water overflows, the Service, develop river Company shall, at all times quality models and sewer hydraulic models to the satisfaction of environment standards.

MEASUREMENT AND SAMPLING EQUIPMENT

All equipment provided for measuring, testing, sampling or monitoring the volume, strength, quality or characteristics of influent, effluent, or sludge, or concentrations of ours, shall comply with applicable defined provisions.

WASTEWATER TREATMENT - SAMPLING AND MONITORING

The Service Company will be required to take and test daily composite samples of the influent and effluent of each treatment plant. The Service Company will be responsible for ensuring that the adopted waste water sampling programme meets the requirements of the relevant water authorities.

FLOW MONITORING EQUIPMENT

The Service Company will ensure that the accuracy of the flow monitoring equipment is checked by an independent party every three months for the first year of the Contract Period and annually thereafter. If an inaccuracy is found at an annual check, then checks will revert to a three-month interval for a period of no less than one year.