Value for money must be determined through a net present value comparison of the comparable costs and risks of the proposed P3 project with the Public Sector Comparator (PSC). The PSC is the Traditional Procurement approach (Design-Bid-Build) and is compared to the P3 over the same life cycle, as demonstrated by the detailed Business Case. Other procurement options such as Design-Build approach may be considered for suitable projects where value can be derived by bundling of facilities as a single project delivery, but as the Design-Build is not yet a proven, sustainable procurement method for the province it is not used as the PSC.