Section 4 Procurement Options

Purpose of the Procurement Options Section:

This section should consider all procurement approaches that could deliver the project. It should include the methodology adopted including the detailed information on delivering the services. The different approaches should be compared to each other and include a qualitative description of the benefits and drawbacks of the adopted approach.

This section should clearly identify that the approaches considered are viable to deliver the project within the allowable time frame and financial constraints.

The benefits and drawbacks should be clearly identified

Traditional Procurement by GOA

Design-Build approach by GOA

P3 procurement as Design-Build-Finance-Operate/Maintain approach