The following PV requirements for this development were observed:
• a PSC was constructed and used to assess bids
• an output specification (i.e. the design brief) was contained within the Request for Proposal (RFP)
• a public interest test was conducted
• appropriate sign-offs and approvals were sought and gained from the relevant ministers and Cabinet.