The risk and preferred risk allocations identified in this table are guides only, and should not be considered a substitute for detailed analysis on a case-by-case basis. For example, economic infrastructure projects that do not rely on a Government-sourced revenue stream can sometimes accommodate greater risk transfer to the private sector.
Acknowledgment: This Appendix is substantially reproduced from Partnerships Victoria Guidance Material with the permission of the State of Victoria. Copyright in the reproduced Material belongs to the State of Victoria.