There are two key elements. Firstly, that the asset's maintenance requirements will be different to those predicted and secondly that there will be a difference in unit cost of maintenance. Both the potential upside and downside of these risks is transferred to the private sector. The Provider should therefore have an incentive to produce an asset with the lowest whole-life cost - or at least the lowest cost until it is handed back to the Promoter.