1.17 The following six projects are additions to this year's Report:
• SEA 4000 Phase 3 Air Warfare Destroyer Build;
• AIR 5349 Phase 1 Bridging Air Combat Capability (Super Hornet);
• AIR 9000 Phase 2,4 & 6 Multi Role Helicopter;
• JP 2048 Phase 4A/4B Amphibious Deployment and Support (LHD Ships);
• AIR 5402 Air to Air Refuelling Capability; and
• AIR 5376 Phase 3.2 F/A-18 Hornet Upgrade Structural Refurbishment.
1.18 The following nine projects were reported last year and progress during 2008-09 is included in this year's Report:
• AIR 5077 Phase 3 Airborne Early Warning and Control Aircraft;
• AIR 87 Phase 2 Armed Reconnaissance Helicopter;
• AIR 8000 Phase 3 C-17 Globemaster III Heavy Airlifter;
• AIR 5376 Phase 2 F/A-18 Hornet Upgrade;
• SEA 1390 Phase 2.1 Guided Missile Frigate Upgrade Implementation;
• LAND 116 Phase 3 Bushmaster Protected Mobility Vehicle;
• JP 2043 Phase 3A High Frequency Modernisation;
• SEA 1444 Phase 1 Armidale Class Patrol Boats; and
• SEA 1439 Phase 4A Collins Replacement Combat System.