3. Project Longitudinal Analysis

3.1 The Project Executive Summaries and Status Outlines in Chapter 2 provide a snapshot of each project and make observations about their performance. This chapter provides a longitudinal analysis that compares and contrasts performance across the 15 projects and includes an analysis of key aspects of this performance. As the number of projects included in the DMO MPR increases over time, the longitudinal analysis is expected to indicate trends and enable more systemic observations on DMO project performance.

3.2 For the purpose of the longitudinal analysis, projects have been referred to with the following abbreviated titles (in tables and diagrams) that follow:

Project Number

Project Name

Abbreviation

SEA 4000 Ph 3

Air Warfare Destroyer Build

AWD Ships

AIR 5349 Ph 1

Bridging Air Combat Capability

Super Hornet

AIR 9000 Ph 2, 4 & 6

Multi Role Helicopter

MRH90

AIR 5077 Ph 3

Airborne Early Warning and Control Aircraft

Wedgetail

JP 2048 Ph 4A/4B

Amphibious Deployment and Support

LHD Ships

AIR 87 Ph 2

Armed Reconnaissance Helicopter

ARH Tiger

AIR 5402

Air to Air Refuelling Capability

Air to Air Refuel

AIR 8000 Ph 3

C-17 Globemaster III Heavy Airlifter

C-17 Heavy Airlift

AIR 5376 Ph 2

F/A-18 Hornet Upgrade

Hornet Upgrade

SEA 1390 Ph 2.1

Guided Missile Frigate Upgrade Implementation

FFG Upgrade

AIR 5376 Ph 3.2

F/A-18 Hornet Upgrade Structural Refurbishment

Hornet Refurb

LAND 116 Ph 3

Bushmaster Protected Mobility Vehicle

Bushranger36

JP 2043 Ph 3A

High Frequency Modernisation

HF Modernisation

SEA 1444 Ph 1

Armidale Class Patrol Boats

Armidales

SEA 1439 Ph 4A

Collins Replacement Combat System

Collins RCS




_______________________________________________________________________________

36 The Bushmaster Protected Mobility Vehicle is also known as 'Project Bushranger'. 'Bushranger' has therefore been used as the abbreviated name of the project for the purposes of this analysis.

More Information