2.6 Prime Acquisition Contractor(s) Real Price Increases and Capital Equipment Quantities Required

Prime Contractor(s)

Price (Base) at

Equipment

Quantities at

Signature

30 Jun 09

Signature

30 Jun 09

Australian Aerospace

846.3

2,487.5

MRH90 aircraft

12

46

MRH Instrumented System(1)

0

1

Electronic Warfare Self Protection Support System

1

1

MRH Software Support Centre

0

1

Ground Mission Management System:

Deployable Units

Interim Units

Fixed Sites

2

0

0

16

2

4

Explanation

Phase 4 and 6 scope incorporated into contract at signature of a CCP in June 2006. Note 1: Three of the MRH90 aircraft are capable of being fitted with the Instrumented System.