2.6 Prime Acquisition Contractor(s) Real Price Increases and Capital Equipment Quantities Required
|
Prime Contractor(s) |
Price (Base) at |
Equipment |
Quantities at |
||
|
Signature |
30 Jun 09 |
Signature |
30 Jun 09 |
||
|
Australian Aerospace |
846.3 |
2,487.5 |
MRH90 aircraft |
12 |
46 |
|
MRH Instrumented System(1) |
0 |
1 |
|||
|
Electronic Warfare Self Protection Support System |
1 |
1 |
|||
|
MRH Software Support Centre |
0 |
1 |
|||
|
Ground Mission Management System: Deployable Units Interim Units Fixed Sites |
2 0 0 |
16 2 4 |
|||
|
Explanation |
Phase 4 and 6 scope incorporated into contract at signature of a CCP in June 2006. Note 1: Three of the MRH90 aircraft are capable of being fitted with the Instrumented System. |
||||