Project | Description of Project | Description of Dependency |
AIR 5376 F/A-18 Hornet Upgrade | Upgrade of the F/A-18 Hornet communications, navigation and mission computing systems. | Air to air data communications in support of the air defence mission. |
AIR 5402 Air to Air Refuelling Capability | Provision of five Multi-Role Tanker Transport aircraft and associated supplies and support. | Air-to-air refuelling support for extended range/duration airborne early warning and control missions. |
AIR 5333 2CRU and 3CRU Replacement (Vigilare) | Replace the fixed, ground-based Aerospace Surveillance and Battlespace Management command and control capability. | Coordination between airborne early warning and control and ground-based control units. |
AIR 5405 Mobile Regional Operations Centre | Replace the deployable, ground-based Aerospace Surveillance and Battlespace Management command and control capability. Not yet approved. | Coordination between airborne early warning and control and deployed ground-based control unit. |
JP 2008 MILSATCOM | Provision of a military satellite communications system. | Air-to-surface and air-to-air communications support. |
JP 2030 Phases 5B and 7B Air Command Support System | Provision of enhancements to the Air Command Support System. | Command and control interface for the airborne early warning and control Mission Support System. |
JP 2072 Battlespace Communications | Provision of an enhanced battlespace communications system for the land environment. Not yet approved. | Terrestrial communications support to the deployable airborne early warning and control Mission Support System. |