2.6 Prime Acquisition Contractor(s) Real Price Increases and Capital Equipment Quantities Required
| Prime Contractor(s) | Price (Base) at | Equipment | Quantities at | ||
| Signature | 30 Jun 09 | Signature | 30 Jun 09 | ||
| Australian Aerospace | 1,139.9 | 1,330.5 | ARH Fleet |
|
|
| 22 | 22 | ||||
| ARH Software Support Capability | 1 | 1 | |||
| Training System | |||||
| Full Flight and Mission Simulator | 1 | 1 | |||
| Cockpit Procedures Trainers | 2 | 2 | |||
| Groundcrew Training Devices | 6 | 6 | |||
| Ground Segment Operational and Support Systems | |||||
| Electronic Warfare Mission Support System | 1 | 1 | |||
| Ground Mission Equipment Fixed Site Systems | 5 | 5 | |||
| Ground Mission Equipment Deployable Systems | 7 | 9 | |||
| Maintenance Management System | 1 | 1 | |||
| Explanation | Additional Ground Mission Equipment sets were identified to meet Army's operational and fixed site requirements. The 2007/08 report Price ($m Base) at Signature of $1,087.3m was incorrect as it was calculated using the exchange rate of the day rather than the contractually approved foreign exchange rate conversions. The Price ($m Base) at Signature using the contract exchange rates equates to $1,139.9m. | ||||