2.6 Prime Acquisition Contractor(s) Real Price Increases and Capital Equipment Quantities Required
| Prime Contractor(s) | Price (Base) at | Equipment | Quantities at | ||
| Signature | 30 Jun 09 | Signature | 30 Jun 09 | ||
| Phase 2.1 | |||||
| The Boeing Company | N/A | N/A | Aircraft Modification kits | 71 | 71 |
| Full scale production program | 1 | 1 | |||
| Upgraded benchtop training aid | 3 | 3 | |||
| Integrated Maintenance Training System | 3 | 3 | |||
| US Government | N/A | N/A | Radars | 71 | 71 |
| Phase 2.2 | |||||
| The Boeing Company | N/A | N/A | Design and Development | 1 | 1 |
| Prototype Aircraft | 0 | 2 | |||
| Aircraft Modification kits | 0 | 69 | |||
| Upgraded Colour Displays, sets | 0 | 69 | |||
| Integrated Maintenance Training System | 0 | 1 | |||
| Spare Colour Displays | 0 | 25 | |||
| US Government | N/A | N/A | Joint Mission Planning System | 24 | 24 |
| Multifunctional Information Distribution System | Classified | Classified | |||
| Joint Helmet Mounted Cueing System | 73 | 73 | |||
| Counter Measures Dispensing Unit | 73 | 73 | |||
| Advanced Memory Unit | 73 | 73 | |||
| Aircraft Software | 1 | 1 | |||
| Spares | Various | Various | |||
| Boeing Defence Australia / BAE Systems Australia | N/A | N/A | Fleet Modification | 69 | 69 |
| Phase 2.3 | |||||
| The Boeing Company | N/A | N/A | Design and Development | 1 | 1 |
| Aircraft Flight Test Kits | 2 | 2 | |||
| Pylon Flight Test kits | 4 | 4 | |||
| Aircraft Modification kits | 0 | 73 | |||
| Pylon Modification kits | 0 | 244 | |||
| Pylon umbilical Modification kits | 0 | 42 | |||
| Pylon Adaptors | 0 | 36 | |||
| Integrated Counter Measures Control Panel | 0 | 2 | |||
| Elta Systems Ltd | N/A | N/A | Electronic Counter Measures Pods | 32 | 32 |
| Support and Test Equipment | Various | Various | |||
| SAAB AB (publ) | N/A | N/A | Design and Development | 1 | 1 |
| Counter Measures Dispenser Set | 0 | 76 | |||
| Pylon Modification kits | 0 | 76 | |||
| Mission Data File Generator | 0 | 1 | |||
| US Government | N/A | N/A | Radar Warning Receivers | 66 | 73 |
| Software | 1 | 1 | |||
| Risk Reduction Program | 1 | 1 | |||
| In Service Support | 0 | 1 | |||
| Boeing Defence Australia / BAE Systems Australia | N/A | N/A | Validation and Verification Aircraft Modification | 3 | 3 |
| Interim Electronic Warfare Aircraft Modification | 14 | 14 | |||
| Boeing Defence Australia | N/A | N/A | Fleet Modification | 68 | 68 |
| Raytheon Australia | N/A | N/A | Tactical Operational Flight Trainers | 3 | 3 |
| Tactical Readiness Trainers | 0 | 3 | |||
| Software | 1 | 1 | |||
| Tactical Operational Flight Trainers hardware upgrade | 0 | 1 | |||
| Spares | Various | Various | |||
| Explanation | Base date dollars have not been provided for this project. As the prime systems integrator, the Commonwealth is undertaking a strategy of incremental contracting of work packages as they are defined. This results in varying base dates for almost 50 separate work packages contracted. As a result expressing real price increases/ decreases at a total prime contract level in base date dollars is not feasible. | ||||