Description of Dependency

Air 5376 Phase 3.1

Air 5376 Phase 3.1, the first of a two-staged structural refurbishment program, seeks to extend the structural fatigue life of the F/A-18 Hornet through incorporation of several discrete structural modifications and inspections.

Air 5376 Phase 3.1 must be incorporated on each aircraft before that aircraft can undergo modification by Air 5376 Phase 3.2.