Project | Description of Project | Description of Dependency |
Air 5376 Phase 3.1 | Air 5376 Phase 3.1, the first of a two-staged structural refurbishment program, seeks to extend the structural fatigue life of the F/A-18 Hornet through incorporation of several discrete structural modifications and inspections. | Air 5376 Phase 3.1 must be incorporated on each aircraft before that aircraft can undergo modification by Air 5376 Phase 3.2. |