Project referred in to Basis for Qualified Conclusion

Project Expenditure History (Table 2.2) - Base Date figure not reported for:

●  Air Warfare Destroyer Build

- SEA 4008 Phase3

●  Bridging Air Cornbat Capability

- AIR 5349 Phase1

●  Overlander

-LAND 121 Phase 3

●  Armed Re[Illegible] Helicopter

- AIR 87 Phase 2

●  F/A-18 Horner Upgrade

- AIR 5376 Phase2

●  C-17 Globemaster III Heavy Airlifter

- AIR 8000 Phase 3

●  Guided Missile Frigate Upgrade Implementation

- SEA 1390 Phase 2.1

●  F/A18 Hornet Structural Refurbishment

- AIR 5376 Phase 3.2

●  Busmaster Protected Mobility Vehicle

- LAND 116 Phase 3

●  Next Generation SATCOM Capability

- JP 2008 Phase 4

●  High Frequency Modernisation

- JP 2043 Phase 3A

●  Armidale Class Patrol Bost

- SEA 1444 Phase 1

●  Anti-Ship Missile Defence

- SEA 1448 Phase 2B

●  Collins Replacement Combat System

- SEA 1439 Phase 4A

●  Replacement Heavyweight Torpedo

- SEA 1429 Phase 2

●  Collins Class Submarine Reliability and Sustainability

- SEA 1439 Phase 3

●  Follow-On Stand On Weapon

- AIR 5418 Phase 1

●  ANZAC Anti-Ship Missile Defence

- SEA 1448 Phase 2A

Project Expenditure History (Table 2.2) - 'Other' FY to Jun 10 - Base Date figures not reported for:

●  Airborne Early Warning and Control Aircraft

AIR 5077 Phase 3

Contract Details (Table 2.3) Price at Signature and Price at 30 June 2010 - Base Date figures not reported for:

●  F/A-18 Hornet Upgrade For the Boeing and Raytheon contracts.

AIR 5376 Phase 2

●  F/A-18 Hornet Structural Refurbishment - For the L3 MAS, Boeing and BAE & L3MAS contracts.

AIR 5376 Phase 3.2

●  Collins Replacement Combat System

SEA 1439 Phase 4A