Maturity Score | Attributes | Total | |||||||
Schedule | Cost | Requirement | Technical Understanding | Technical Difficulty | Commercial | Operations and Support | |||
Project Stage: Acceptance Testing | Benchmark | 8 | 8 | 8 | 8 | 9 | 8 | 8 | 57 |
Current Project | 10 | 8 | 9 | 8 | 9 | 8 | 9 | 61 | |
Explanation | • Schedule: This attribute measures where in the project life cycle the project is with respect to delivering the ISD capability. The difference between the benchmark and current project score is due to the achievement of MRH90 ISD and because the first eleven MRH aircraft and support systems have been accepted into service. • Requirement: This attribute measures how well a requirement is being realised. The difference between the benchmark and current project score is due to the MRH System design and acceptance testing phases being essentially complete. Additionally, the project office, with Navy and Army, is conducting validation trials to demonstrate that the system meets in-service requirements. • Operations and Support: This attribute measures how prepared the project is to deliver an operating system. The difference between the benchmark and current project score is because the MRH System has commenced progressive transition from the acquisition environment to the in-service support and operational organisations. | ||||||||
Project Stage | Total Benchmark Score | Total Current Score | |
Acceptance Testing | 57 | 61 | |
| |||