2.3  Contract Details

Contractor

Signature date

Price at signature (base) $m

Quantities at signature

Price at 30 Jun 10 (base) $m

Quantities at Jun 10

Equipment

Notes

Australian Aerospace

Jun 05

846.3

12

2,495.1

 

46

MRH90 Aircraft

7

 

1

1

ElectronicWarfare Self Protection Support System

 

 

0

1

MRH Software Support System

 

 

0

1

MRH Instrumented System

8

 

2

22

Ground Mission Management Centre

9

CAE Australia

Dec 07

186.2

2

187.2

2

Full Flight and Mission Simulator

 

Major equipment received and quantities to 30 Jun 10

Eleven aircraft have been accepted by the Commonwealth. Engineering and maintenance arrangements established.

Notes

Note 1:

This project's original DMO budget amount is that prior to achieving Second Pass Government Approval.

Note 2:

Incorporation of AIR 9000 Phase 4 (Black Hawk Upgrade/Replacement) and AIR 9000 Phase 6 (Maritime Support Helicopter).

Note 3:

The funding related to facilities elements of the project that will be managed by DSG.

Note 4:

Transfer to DSG for Facilities Infrastructure.

Note 5:

RCI funding for Full Flight and Mission Simulator Facilities.

Note 6:

Other expenditure comprises: operating expenditure, contractors, consultants, contingency, other capital expenditure not attributable to the aforementioned contracts and minor contract expenditure.

Note 7:

$2,495.1m includes the total current contract price (Base date exchange rates) including the Aircraft and all Sub-Systems listed in the table at section 2.3.

Note 8:

The MRH Instrumented System includes an airborne instrumentation pallet, some ground based instrumentation, and three aircraft (from the total fleet of 46) that have provisions to have the instrumentation pallet installed.

Note 9:

Numbers have increased from 2 Deployable Ground Mission Management Systems (GMMS) to 4 Fixed GMMS, 7 Deployable GMMS, 1 Reduced, 9 Light and 2 interim GMMS.