4.3  Linked Projects

Project

Description of Project

Description of Dependency

SEA 1439 Phase 4A

Replacement Combat System

SEA 1439 Ph 3 have provided Global Positioning Systems (GPS) to SEA1439 Ph 4A for installation with each Replacement Combat System (RCS) implementation.

SEA 1446 Phase 1

Interim Minimum Operating Capability

SEA 1446 Ph 1 supplied approved and verified fast track platform designs for implementation into four submarines.