1.3  Structure of report

The report is structured as follows:

•  Section 2 provides a brief summary of previous studies investigating the relative value for money between PPPs and Traditional procurement;

•  Section 3 details the methodology adopted for this study;

•  Section 4 presents a summary of the data collected and the results of this benchmark study based on a compilation of all jurisdictions considered;

•  Section 5 discusses the results of the study and considers the implications of the findings.