B3.2 | Dealing with multiple operational interfaces - positive early signs

The parties are so far dealing successfully with multiple interfaces. Numerous parties work on the Tube, and all need access. To date, the system of scheduling access appears to work well, with more punctual handover of the track by LUL to the Infracos than during shadow running. However, there are some engineering overruns into early morning operations - see Case example 5 on page 44.