B.2. Systems

Element

Standard

Infrastructure services including:

sanitation and drainage systems, water systems fuel storage plant, electricity distribution system, LV and HV, gas distribution system, telecoms (voice) data networks, security systems, fire systems, and alarms,

street lighting, and building management systems

all infrastructure services shall function as intended, at the correct temperatures, pressures and flow rates, voltages and frequency, quality and standards without undue noise or vibration;

Heating and ventilation services

including fume cupboards, humidifiers heaters, ductwork, mixing boxes and fire and smoke dampers, coolers, inlet/outlet grilles, refrigeration plant, cooling towers, boilers, LPHW distribution including TMVs, calorifiers, heat exchangers, pumps and other local ventilation systems

all heating and ventilation services shall function as intended, at the correct temperatures, pressures and flow rates, voltages and frequency, quality and standards without undue noise or vibration

air changes and ventilation levels as required to achieve the Availability Standards

ductwork, fittings and pipework shall be securely fastened to their intended points of anchorage

there shall be no leaks of water (or other heating/cooling medium) or air from ventilation systems

secure to authorised access only

free from corrosion, erosion and organic growth;

grilles and vents are free from dirt & dust

Specialist services

Including uninterruptible power supply systems, specialist fridge's and freezers, automatic fire detection and fire fighting systems, generators and lifts

all specialist services shall function as intended, at the correct temperatures, pressures and flow rates, voltages and frequency, quality and standards without undue noise or vibration;

Fire fighting equipment

fire extinguishers and other fire fighting equipment shall be maintained in accordance with BS 5306 Part 3 Code of Practice or equivalent

sound, secure and fixed to their intended point of anchorage

fully operational within manufacturer's recommendations

hydrants, sprinklers and hoses shall be at correct operating pressure and capacity;

pipework shall be free from corrosion, leaks and drips

be of suitable type and quantity for the hazards present within their vicinity

Lifts

service lifts are key operated to avoid unauthorised use

no persons shall be trapped in a lift for more than 30 minutes

shall have a fully functioning control panel and phone

[shall have a functioning emergency communication system]

[shall function as intended, including any operating controls (key operation, access control etc.)]

Mechanical and electrical services

(including [lighting installation, internal electrical power and lighting installations, emergency lighting systems, communications systems, data cabling, security and fire alarm systems, fixed electrical appliances, lifts, space heating systems, cooling systems, air conditioning systems, ventilation extracts and air systems, internal fire extinguishing systems, electrical mains distribution system, emergency electrical generation plant, chilling plant and chilled water storage and distribution systems, thermal systems and distribution systems, heating plant, steam and hot water distribution systems, domestic hot water storage and distribution systems, central air handling plant, cold water storage and distribution systems, emergency electrical central battery systems, water treatment systems, fixed and portable first aid fire fighting systems other than automatic fire fighting systems detailed above, mechanical & electrical control systems, external natural gas installations, external mains water installations, and external fire hydrant installations])

all mechanical and electrical services shall function as intended, at the correct temperatures, pressures and flow rates, voltages and frequency, quality and standards without undue noise or vibration

Emergency power supply

(As appropriate)

standby power source shall be operational, secure and tested regularly

emergency lighting units shall comply with BS5299, be free from dust at the point of Programmed Maintenance and/or Unprogrammed Maintenance, operational and fully charged

batteries and battery rooms shall be adequately ventilated, free from acid leakage; batteries shall be topped up and fully charged

static inverters shall be in working order and not overheat during normal operational loading

HV / LV distribution

ratings shall be clearly marked

fuse elements or circuit breaker mechanisms in working order

contacts and connections clean and mechanically tight

no overheating during normal operating loads

secure to authorised access only

recording instruments operational where necessary

transformers are free from oil leaks

protective coatings are intact

IDMT relays and grading charts

no signs of excessive heating

electric strength of oil satisfactory

cable joint boxes free from compound leaks

marker and covering notices where necessary

Electrical power and other cabled systems, (including [IT, BMS communications, lighting, safety systems; and alarm systems, CCTV, access control)

electrical installations to comply with BS7671 or equivalent

weatherproof where appropriate

wiring, fittings, fixtures, controls and safety devices shall be properly housed and fastened securely to their intended point of anchorage and labelled.

lighting conductor should be complete, isolated and comply with BS6651 or equivalent

light illuminance within CIBSE design Lux levels

all systems function as specified in [Schedule Part 6 (Construction Matters)]

Hot and cold water systems

deliver water at the required temperatures, quality criteria and flow rates as the design intended

taps, valves and other related fittings and fixtures function as intended

pipework and fittings shall be fastened securely to their intended points of anchorage

there shall be no drips or leaks of water from pipework, taps, valves and/or fittings

Public health and other drainage systems, (including [all sanitary ware and associated fittings])

provide a safe and comfortable environment

all pipework and fittings fastened securely to their intended points of anchorage

there shall be no leakage of waste and/or foul water and/or rain water

Free from persistent odour

Free flowing and free from blockage