6 Construction Matters
| Schedule Part | Comment |
| 6 | Construction Matters |
| This section will usually include the following: • Introduction to what is comprised within the Facilities • Architectural performance specification • Civil/Structural performance specification • Mechanical and Electrical performance specification • Thermal and energy efficiency requirements • Area Schedule • Drawings The Authority should also ensure that it includes the wording provided by WRAP to the SFT, details of which can be found at [http://www.scottishfuturestrust.org.uk] Any design requirements in relation to thermal and energy efficiency (such as those formerly in Clause 12 (Design Responsibility) of the DBFM template project agreement) should be included here. Authorities should also seek advice from technical advisors on design review, construction monitoring and tests on completion to give a high degree of assurance that the design requirements have been achieved before the services commence. These are all matters that Authorities also require to address for capital funded assets and a generally similar approach should be adopted. | |
| | This section will usually include the following: • Introduction • Architectural proposals • Civil/Structural engineering proposals • Mechanical and Electrical engineering proposals • Thermal and energy efficiency proposals • Construction Methodology • Drawings (full design to be developed at least to 1:200 level, with a sample drawing of each key area of the Facility developed to 1:50 level) • Management proposals. |
| This section should include the design that is to be developed in accordance with principles set out in the Review Procedure e.g. 1:200 drawings of site plans, 1:50 drawings of room layouts, etc. | |
| This section should include a room by room design and contents schedule. | |
| This section should provisions relating to the monitoring (through design and construction) and testing (on completion) of the Authority's thermal and energy efficiency requirements. | |
| | This section should contain Design and Construction Quality Plans. |