Band | Tonnage Range | ||
Minimum | Maximum | ||
Band 1 | 0 | [bid back] | [e.g. 50] |
Band 2 | [bid back] | [bid back] | [bid back] |
Band n | [bid back] | [bid back] | [bid back] |
_________________________________________________________________
23 The Contractor to provide this information as part of the bid.