SCHEDULES
>
SCHEDULE PART 15 INSURANCE REQUIREMENTS
>
SECTION 1 POLICIES TO BE TAKEN OUT BY SUB-HUBCO AND MAINTAINED DURING THE DESIGN AND CONSTRUCTION PHASE
>
2 DELAY IN START UP INSURANCE (DSU)
>
2.6 Period of Insurance
2.
6
Period of Insurance
As per the
Contractors' "All Risks" Insurance
, excluding the defects liability period.