SCHEDULES
>
SCHEDULE PART 15 INSURANCE REQUIREMENTS
>
SECTION 1 POLICIES TO BE TAKEN OUT BY SUB-HUBCO AND MAINTAINED DURING THE DESIGN AND CONSTRUCTION PHASE
>
3 CONSTRUCTION THIRD PARTY LIABILITY INSURANCE
>
3.6 Period of Insurance
3.6
Period of Insurance
As per the
Contractors' "All Risks" Insurance
,
including
the defects liability period.