SCHEDULES
>
SCHEDULE PART 15 INSURANCE REQUIREMENTS
>
SECTION 1 POLICIES TO BE TAKEN OUT BY PROJECT CO AND MAINTAINED DURING THE DESIGN AND CONSTRUCTION PHASE
>
3 CONSTRUCTION THIRD PARTY LIABILITY INSURANCE
>
3.4 Territorial Limits
3.4
Territorial Limits
UK [and elsewhere in the world in respect of non manual visits].