[ANNEXES]
>
ANNEX 3 STANDARD REQUIRED INSURANCE SCHEDULE (SCHEDULE [ ] REQUIRED INSURANCES)
>
Part 2 Policies to be taken out by the Contractor and maintained during the Service Period.
>
1. Property Damage Insurance
>
1.4 Maximum Deductible
1.4
Maximum Deductible
£[ ] each and every claim. (escalated periodically as appropriate)