$27 billion

Los Angeles -San Francisco High Speed Rail California

California High Speed Rail Authority

Design-Build-Operate-Maintain-Finance.

RFQ/RFP. Best Value.

TBD

Legislature recently signed a bill that places a nearly $10 billion general obligation bond on the November 2004 ballot to fund planning and construction.

The Authority is preparing a program-level EIR/EIS which will be available to the public in August 2003.

$4.7 billion

Alaskan Way Viaduct Seattle, WA

Washington State DOT

TBD

TBD

TBD

Potential funding sources may include: regional tax-federal; regional, state or city sources; other potential beneficiaries; toll revenue; other user fees.

WSDOT and the City have identified a favored plan. More detailed engineering and environmental analysis will need to be completed before a final plan is selected mid 2004.

$3.5-4.2 billion

Maglev Project Maryland 40-mile project connecting D.C.'s Union Station, BWI and Downtown Baltimore.

Maryland Transit Administration

Design-Build-Operate-Maintenance.

RFQ/RFP. Best Value.

TBD

Environmental review complete (funds authorized for additional consultant work in 2003).

Awaiting selection by FRA.

$1.5-2.7 billion

710 Reconstruction and Widening Southern California Ports of Long Beach and Los Angeles 

Ports of Long Beach and Los Angeles/ Gateway Cities Council of Governments (29 cities)

TBD

TBD

TBD

Project in environmental review. PPI strategy paper submitted to Gateway Cities and Long Beach.

$985 million

SR-509/I-5 Freight and Congestion Relief Project Extension with 6 lanes, two general use and one HOV lane in each direction. Will connect SR 509 at South 188th Street in SeaTac to I-5 near South 211th Street. Also a four-lane access road that links directly to SeaTac International Airport from the south.

Washington State DOT

 

 

 

$800,000 in Federal funding through the Puget Sound Regional Council (PSRC) in late February, which will be used to continue project design work through November 2003.The Regional Transportation Investment (RTID) District is developing a Puget Sound tri-county transportation tax package which may be included on the November 2003 ballot.

FEIS issued to January 2003. Record of Decision (ROD) signed by FHWA March 2003.

First stage of construction to begin 2005.

$600 million - $1 billion

LBJ/I-635 HOV/Managed Toll Lanes Dallas, TX

Texas DOT

Comprehensive Development Agreement. Design-Build.

RFQ/RFP. Best Value.

TBD

Procurement strategy development underway.

$500 million

Eastside Light Rail Project Los Angeles, CA 7-mile light rail transit line, including 9 stations and a 1.8-mile mid-section tunnel, from Union Station along Alameda Street through the East Los Angeles communities.

Los Angeles County Metropolitan Transportation Authority

Design-Build for street running segment; Design-Bid-Build for tunnel portion of project.

Low bid from pre-qualified teams.

TBD

Project under construction. Forecasted to open 2009.

$42.2 million

I-405 Corridor Project Washington State Widening of the I-405 and 7 bridges between the SR 527 interchange and the I-5 interchange.

Washington State DOT

Design-Build and Design-Bid-Build.

 

 

$10.5 million from the State as implementation seed money, $2.2 billion over next 10 years allocated in 2002 transportation budget.

 

SR 520 Trans-Lake Washington Project Washington State HOV lanes added and bridge replacement across Lake Washington.

Washington State DOT

 

 

 

Legislative appropriations passed in May 2003. Regional Transportation Investment District (RTID) is developing a potential funding package for approval by the voters.

Additional money will likely come from tolls and other user fees. Alternative project plans are being evaluated. Analysis underway to develop first phase.

TBD

Wilmington Monorail Wilmington, DE Regional monorail system to serve Wilmington, Delaware area.

Wilmington, Delaware Area Planning Council

TBD

TBD

TBD

Feasibility study underway.

TBD

Southern California Maglev Project 92-mile, 8 station project connecting Los Angeles International Airport, former March Air Force Base, Orange County and Downtown Los Angeles transportation center.

Southern California Association of Governments

Design-Build-Operate-Maintain-Finance.

TBD

TBD

Consultant team has been selected.

N/A

State-Wide Design-Build Program New York

New York State Department of Transportation

Design-Build.

RFQ/RFP. Best Value.

N/A