[The contents of this Part 13 of the Schedule are project specific and should be prepared by each Board on a project basis.]
___________________________________________________________________________
45 This Part 13 of the Schedule should include a list of the equipment that Project Co is required to procure and install and any other items that are relevant to equipment on a project specific basis.