In this Part 18 of the Schedule and in this Agreement (save where Part 1 of the Schedule provides to the contrary) the following words shall have the following meanings:
means a state or condition of the relevant Functional Part or the means of access to it which allows all persons who are entitled to enter, occupy or use the relevant Functional Part to enter and leave the Functional Part safely and conveniently; | |
has the meaning set out in paragraph 6.5 of Section C of this Part 18 of the Schedule; | |
means the sum in pounds sterling payable by the Board to Project Co for the provision of the Ad-Hoc Services in accordance with this Agreement; | |
means Services which, in accordance with Part 14 of the Schedule (Service Level Specifications) the Board is entitled to require Project Co to provide but where Project Co's obligation to provide those Services does not arise unless and until it is requested to do so by the Board; | |
means a request for the provision of Ad-Hoc Services made by the Board to Project Co in accordance with Part 14 of the Schedule (Service Level Specifications); | |
means Energy Consumption in the relevant Energy Year as adjusted to reflect the difference between the number of Degree Days applicable to that Energy Year and the number of Degree Days in the 20 Year Average; | |
means, in relation to the Installation(s) at the Facilities in any Scheme Year, the Allowances for emissions (within the meaning of Schedule 1 Part 1 of the GGETS Regulations and Article 3 of the Directive) allocated to the Designated Operator (and in respect of any period shorter than a Scheme Year the Allowances for emissions shall be allocated pro rata);66 | |
has the meaning set out in the GGETS Regulations; | |
has the meaning given to that term in paragraph 4.1 of Section H of this Part 18 of the Schedule (Payment Mechanism); | |
means the total number of Units of Energy which it is expected will be used at the Facilities in each Energy Year, calculated in accordance with paragraph 2.7 of Section F of this Part 18 of the Schedule, as adjusted in accordance with paragraph 3 of Section F of this Part 18 of the Schedule; | |
the first and every subsequent anniversary of the end of the Initial Period; | |
means the sum in pounds sterling calculated in accordance with the provisions set out in Section B paragraph 2 of this Part 18 of the Schedule; | |
means the percentage weighting ascribed to the relevant Functional Area for the purpose of calculating Deductions for Unavailability Events as set out in Appendix C to this Part 18 of the Schedule; | |
67 [means any of (i) the Accessibility Condition, (ii) the Safety Condition, (iii) the Use Condition and (iv) the Prescribed Health Function Condition or, as appropriate, the Prescribed Operational Function Condition;] [means in respect of each Phase: (a) from the Phase Actual Completion Date until the Commissioning End Date of each Phase, (i) the Safety Condition, (ii) the Accessibility Condition and (iii) the Use Condition (provided that the Accessibility Condition and Use Condition will be limited to that reasonably required to allow the Board to enter, leave and use the relevant Functional Part safely and conveniently for the purposes of carrying out its activities under the Outline Commissioning Programme); and (b) from the Commissioning End Date for each Phase any of (i) the Accessibility Condition, (ii) the Safety Condition, (iii) the Use Condition and (iv) the Prescribed Health Function Condition or, as appropriate, the Prescribed Operational Function Condition;] | |
means the average cost to Project Co of each Unit of Energy purchased by Project Co during the relevant Energy Year, calculated by taking the average of the Average Unit Costs of Energy for each Contract Month in the Energy Year allowing for the pro rata effect of Contract Months falling partially within the relevant Energy Year; | |
means the average cost to Project Co of each Unit of Energy purchased by Project Co during the relevant Contract Month, calculated in accordance with Section F paragraph 4.10 of this Part 18 of the Schedule as may be amended in accordance with Section F paragraph 5.2 of this Part 18 of the Schedule; | |
means [date68]; | |
has the meaning set out in paragraph 2.5 of Section F; | |
means a date on which the Baseload and Slope is to be reviewed pursuant to paragraph 3.4 of Section F of this Part 18 of the Schedule, being (a) the date which is the third anniversary of the expiry of the Initial Period and every third anniversary thereafter until the Expiry Date or the Termination Date, as the case may be; and (b) the date of expiry of any period of monitoring of Energy Consumption carried out pursuant to Clauses 17.3 and 17.4 of this Agreement, if, in accordance with Clauses 17.3 and 17.4, such monitoring continues after the expiry of the Initial Period; | |
has the meaning given in paragraph 3.2 of Section F of this Schedule Part 18; | |
means a tolerance level for the making of Deductions allowed for a period of time following, as the case may be, a New Service Provider Start Date or the Actual Completion Date [or a Phase Actual Completion Date]69, as more particularly described in paragraph 2 of Section C of this Part 18 of the Schedule; | |
has the meaning given to in Sub-Section B of Section 1 of Part 14 of the Schedule (Service Requirements); | |
has the meaning given to it in Sub-Section B of Section 1 of Part 14 of the Schedule (Service Requirements); | |
has the meaning set out in Part 12 of the Schedule (Outline Commissioning Programme) | |
[means, in respect of each Phase, the period commencing on the Phase Actual Completion Date and ending [number] months following the Commissioning End Date for that Phase;]71 | |
means a calendar month, provided that: (a) the first Contract Month shall be the period from and including Payment Commencement Date 1 to and including the last day of the calendar month in which Payment Commencement Date 1 falls; and (b) the last Contract Month shall be the period from and including the first day of the calendar month in which the Expiry Date or the Termination Date (as the case may be) falls to and including the Expiry Date or the Termination Date (as the case may be); | |
means a deduction made from a Monthly Service Payment in accordance this Part 18 of the Schedule; | |
means, in respect of each Contract Month, the figure, published in [CIBSE Guide J for Area]73 ; | |
means the Operator and Greenhouse Gas Emissions Permit holder for the Installation(s) at the Site pursuant to the GGETS Regulations; | |
means, for the purposes of Section H of this Part 18 of the Schedule (Payment Mechanism), Directive 2003/87/EC of 13 October 2003 for establishing a scheme for greenhouse gas emission Allowances trading within the European Union and amending Directive 96/61/EC as amended by Directive 2004/101/EC; | |
means the level emissions that can reasonably be expected to be generated by activities regulated by the GGETS Regulations for the Site and which is initially as set out in Appendix G to this Part 18 of the Schedule (Payment Mechanism), and thereafter as the same may be adjusted pursuant to paragraph 3 of Section H; | |
has the meaning set out in paragraph 6.2 (Emissions Savings and Excess Emissions) of Section H of this Part 18 of the Schedule (Payment Mechanism); | |
means the higher of the Allocated Allowances and the Emissions Baseload; | |
means electricity, gas, oil, coal and any other fossil-based fuel; | |
means the number of Units of Energy actually consumed at the Facilities during the relevant period; | |
means a period of 12 months beginning on the day after the expiry of the Initial Period and ending on the first Annual Review Date and each subsequent period of 12 months beginning on the day after an Annual Review Date; | |
means an incident or state of affairs which does not meet or comply with the Service Requirements74 set out in Part 14 of the Schedule (Service Level Specifications) and/or does not satisfy the Availability Condition and which Project Co is responsible for Rectifying in accordance with Part 14 of the Schedule (Service Level Specifications)75; | |
has the meaning set out in paragraph 6.3 (Emissions Savings and Excess Emissions) of Section H of this Part 18 of the Schedule (Payment Mechanism); | |
[means a failure or interruption of: (a) telephone, communications, sewerage or drainage services to or from the Site; or (b) the supply of gas to the Site to the extent that the failure or interruption affects equipment which Project Co is not required to fuel from an alternative energy source under paragraph [ ] of the Board's Construction Requirements; or (c) the supply of water to the Site for a period of more than 24 hours provided that Project Co uses best endeavours to provide water from an alternative source; provided that in every case: (a) neither Project Co nor a Project Co Party were responsible for the failure or interruption; and (b) Project Co has (i) informed the Board of such failure or interruption and kept the Board informed of the status of the failure or interruption and measures taken by Project Co under paragraphs (ii) and (iii) below; (ii) used its reasonable endeavours to mitigate the effects of such failure or interruption; and (iii) liaised with the Board and with the relevant utility provider to seek timely resumption of the relevant service;] | |
means an area of the Facilities specified as such in Appendix C to this Part 18 of the Schedule comprising two or more Functional Units; | |
means a Functional Unit or a Functional Area according to the context in which it is used; | |
means a room, a number of rooms or space within a Functional Area which is specified as such in Appendix C to this Part 18 of the Schedule; | |
means the adjustment calculated in accordance with paragraphs 4.6 and 4.7 of Section F of this Part 18 of the Schedule; | |
means the Greenhouse Gas Emissions Trading Scheme Regulations 2005 (SI 2005 No. 925); | |
means the international unit of energy being 1 Joule multiplied by a factor of 10 to the power 9; | |
has the meaning set out in the GGETS Regulations; | |
means the contact point to be established by Project Co pursuant to Part 14 of the Schedule (Service Level Specifications) in respect of the Helpdesk Service (as defined in Part 14 of the Schedule) for the notification of Ad-Hoc Service Requests, the occurrence of Events and other day to day matters arising in relation to the provision of Services; | |
[Month, Year]77 | |
means the period of two years beginning on the first day of the first full Contract Month following the Commissioning End Date78; | |
has the meaning set out in the GGETS Regulations; | |
[To be included as a separate Part of the Schedule if used] | |
[To be defined in Part 14 of the Schedule and in Joint Operating Protocol] | |
means the time (shown on the printout of the Helpdesk records) at which an Event was notified to the Helpdesk or, if a failure affecting the Helpdesk occurs which prevents such a record from being accurately produced, such time as the parties (acting reasonably) agree as the time at which the relevant Event occurred; | |
means a Performance Failure which has been designated as such in the Service Level Specifications or in this Part 18 of the Schedule; | |
means a Performance Failure which has been designated as such the Service Level Specifications or in this Part 18 of the Schedule; | |
means the principles and methodologies contained within the GGETS Regulations and the EU Emissions Trading Scheme Guidance Note 1 dated 30 January 2004 and Note 2 dated 14 May 2004 as published by the Department for the Environment, Food and Rural Affairs in relation to the calculation of the Specified Emissions, together with any guidance supplementing or replacing those Guidance Notes that may be published from time to time; | |
means the Accessibility Condition, the Safety Condition and either the Prescribed Health Function Condition or Prescribed Operational Function Condition (as the case may be) together with the Use Condition, as temporarily modified with the approval of the Board for the purposes of a Temporary Repair; | |
means either (i) £[50] (index linked) or (ii) where the Board continues to use any room or space within the relevant Functional Part and that room or space is in a state or condition which does not comply with any one or more of the Availability Conditions, £[25] (index linked)80; | |
means a Performance Failure which has been designated as such in the Service Level Specifications or in this Part 18 of the Schedule; | |
means the sum in pounds sterling payable by the Board to Project Co in respect of each Contract Month for the provision of the Services in accordance with this Agreement, as calculated in accordance with paragraph 1.1 of Section B of this Part 18 of the Schedule; | |
has the meaning given in Part 14 of the Schedule (Service Level Specifications); | |
has the meaning set out in the GGETS Regulations | |
has the meaning set out in paragraph 2.1 of Section C of this Part 18 of the Schedule; | |
means, where a Service Provider or Sub-Contractor is replaced by a new Service Provider or Sub-Contractor, either: (a) (in the case of replacement following a Market Testing) the date established in accordance with paragraph 10.2 (Service Payment Adjustments) of Part 17 of the Schedule (Benchmarking and Market Testing); or (b) in other cases, the date on which the Services commence to be provided by the replacement Service Provider or Sub-Contractor or, if earlier, the date on which they were first due to be provided by the replacement Service Provider or Sub-Contractor; | |
has the meaning given in Sub-Section B of Section 1 of Part 14 of the Schedule (Service Requirements); | |
has the meaning set out in the GGETS Regulations | |
means the adjustment calculated in accordance with paragraphs 4.8 and 4.9 of Section F of this Part 18 of the Schedule; | |
means costs payable to Project Co pursuant to paragraphs 9.1 and 10 of Section F of this Part 18 of the Schedule as part of any Monthly Service Payment; | |
means any failure by Project Co to provide the Services in accordance with the Service Requirements and which, where a Rectification Time applies, has not been rectified within the relevant Rectification Time, but excluding any Unavailability Event and provided that: (a) if Service Requirements are duplicated in the various Service Level Specifications in Section 1 of Part 14 of the Schedule (Service Level Specifications) and Project Co fails to meet such duplicated Service Requirements, only one Performance Failure will be deemed to have occurred in respect of such failure to provide the Services in accordance with the duplicated Service Requirements. In such cases of duplicated Service Requirements, Project Co and the Board shall endeavour to agree (acting in good faith) to which Service Requirement the Performance Failure should be attributed so that there is no double counting of Performance Failures in respect of one failure to provide the Services in accordance with the Service Requirements. The Helpdesk shall be responsible for implementing such agreement; and (b) in respect of an individual Service Requirement, no more than one Performance Failure shall be deemed to have occurred in the relevant Performance Monitoring Period; | |
means a Deduction which may be made in respect of a Performance Failure; | |
means the period of time specified as such in Part 14 of the Schedule (Service Level Specifications) in respect of a Service or a part of a Service being a period by reference to which Project Co has an obligation to monitor its performance of a Service; | |
has the meaning set out in Part 14 of the Schedule (Service Level Specifications); | |
means Rectification following the agreement of a Temporary Repair; | |
has the meaning given to it in paragraph 9.1.2 of Section C of this Part 18 of the Schedule (Payment Mechanism); | |
[means: (a) [x] % from Payment Commencement Date 1 to the day prior to Payment Commencement Date 2; (b) [y] % from Payment Commencement Date 2 to the day prior to Payment Commencement Date 3; and (c) 100 % from Payment Commencement Date 3 and in any Contract Month in which a Payment Commencement Date falls a pro rata adjustment shall be made to the above percentages reflect the actual number of days in the relevant Contract Month for which each percentage is applicable;] | |
means the clinical use or purpose of the relevant Functional Part (if any);83 | |
means a state or condition of the relevant Functional Part which allows the Prescribed Health Function for that Functional Part to be carried on and performed in accordance with any Law and generally accepted clinical practices for such Prescribed Health Function and having regard to the practicalities of carrying on and performing such Prescribed Health Function; | |
means the use or purpose of the relevant Functional Part where it does not have a Prescribed Health Function; | |
Prescribed Operational Function Condition
| means a state or condition of the relevant Functional Part which allows the Prescribed Operational Function for that Functional Part to be carried on and performed having regard to the practicalities of carrying on and performing such Prescribed Operational Function; |
means any testing, including but not limited to the setting of cultures, required to demonstrate that a Functional Part listed in Appendix E to this Part 18 of the Schedule (Payment Mechanism) meets the Availability Condition; | |
means, following the occurrence of an Event, making good the Event so that the subject matter of the Event complies with the levels of Service required pursuant to this Agreement which shall, without prejudice to the generality of the foregoing, include (a) restoring all functional capability and (b) ensuring that any Functional Part which has been affected by the relevant Event complies with the Availability Conditions and "Rectify" shall be construed accordingly; | |
means a written notice from Project Co to the Board's Representative confirming the date and time that the relevant Event has been Rectified; | |
means the period (which shall commence from the Logged Event Time) specified for Rectification of an Event in Part 14 of the Schedule (Service Level Specifications) provided that if the Board denies Project Co or a Project Co Party access to the relevant Functional Part and in so doing prevents Rectification of that Event, the Rectification Time shall be extended for a period of time equal to the period of time for which Project Co or the relevant Project Co Party is so denied access. For the avoidance of doubt, if no period for rectification is specified in Part 14 of the Schedule (Service Level Specifications) in respect of the relevant Service requirement, no Rectification Time applies; | |
[means the period allowed to Remedy a Performance Failure which does not have a Rectification Time, as set out in the column marked Remedial Period/Remedy in Part 14 to the Schedule]85; | |
[means the agreed actions or tasks detailed in the column marked Remedial Period/Remedy in Part 14 of the Schedule (Service Level Specifications) required to remedy the Performance Failure]; | |
means, for the purpose of Temporary Alternative Accommodation, the date agreed for the return to the original Functional Part in accordance with paragraph 12.3.4 of Section C of this Part 18 of the Schedule; | |
means a state or condition of the relevant Functional Part which allows those persons who it can reasonably be expected may from time to time require to enter, leave, occupy and use such Functional Part to do so safely including but not limited to compliance with the Health and Safety Regime and any other Law or NHS Requirement relating to fire safety or health and safety at work; | |
has the meaning set out in the GGETS Regulations | |
means points allocated to Project Co and to individual Service Providers in respect of the occurrence of Unavailability Events and Performance Failures which are determined by the provisions set out in Section G of, and Appendix A to, this Part 18 of the Schedule; | |
has the meaning given to it in Sub-Section B of Section 1 of Part 14 of the Schedule (Service Requirements); | |
means an eight hour period running from 06:00 to 13:59, or from 14:00 to 21:59 or from 22:00 to 05:59; | |
has the meaning given to it in paragraph 2.6 of Section F of this Part 18 of the Schedule (Payment Mechanism); | |
has the meaning set out in the GGETS Regulations | |
means accommodation offered to the Board by Project Co as a substitute for any Unavailable Functional Part pursuant to paragraph 12 of Section C of this Part 18 of the Schedule (Payment Mechanism); | |
means, in respect of the occurrence of an Event, works of a temporary nature that do not constitute Rectification but satisfy the Minimum Agreed Availability Conditions and substantially make good the relevant Event for the period until a Permanent Repair can be undertaken; | |
means the adjustment calculated in accordance with paragraph 1 of Section F of this Part 18 of the Schedule (Payment Mechanism); | |
means in relation to a Functional Part that such Functional Part or any room or space within it is in a state or condition which does not comply with any one or more of the Availability Conditions;86 | |
means an Event which has not been Rectified within the relevant Rectification Time and which causes a Functional Part to be Unavailable; | |
means one Gigajoule; | |
means the percentage weighting ascribed to each Functional Unit for the purpose of calculating Deductions for Unavailability Events as set out in Appendix C to this Part 18 of the Schedule; | |
means a state or condition of the relevant Functional Part which satisfies the Use Parameters for that Functional Part; | |
means the range of functional requirements for the proper use and enjoyment of a Functional Part for its particular purpose relating to (i) temperature; (ii) humidity; (iii) air-flow; (iv) lighting; (v) power (essential and non-essential); (vi) safe water (relating to availability, temperature, quality and safe sewerage system); (vii) nurse call system; (viii) medical and other equipment; (ix) medical gasses; (x) data sockets and (xi) voice sockets87 as the same are specified on the Room Data Sheets for the relevant Functional Part as set out in Part 8 of the Schedule; | |
means the adjustment calculated in accordance with paragraph 7.1 of Section F of this Part 18 of the Schedule (Payment Mechanism); | |
means the date, for any utility for which Project Co has supply responsibility according to paragraph 8 (Utility Procurement) of Section F of this Part 18 of the Schedule (Payment Mechanism), on which there must be a supply contract in place which would remain in place after the Actual Completion Date, and the date of any subsequent renewal of each utility contract; | |
means the aggregate emissions of the Installation(s) at the Site measured annually (or by references to such other period as may be required by the GGETS Regulations) and which have been verified for the purposes of the Greenhouse Gas Emissions Permit in accordance with the GGETS Regulations; | |
means the amount that would be calculated for the relevant Contract Month in accordance with the formula set out in paragraph 1.1 of Section B of this Part 18 of the Schedule with the sums represented by the element ∑D, PTC, GS, PS, ESA, EEA, IE, IEB and WLA88 being set to zero (0); | |
has the meaning given to it in Sub-Section B of Section 1 of Part 14 of the Schedule (Service Requirements); | |
means, at the relevant date, the most recently available figure showing the number of Degree Days per annum in [CIBSE Guide 18 for [Area]]90 calculated as an average over the immediately preceding 20 years. |
___________________________________________________________________________
66 This, and other GGETS definitions, will only be applicable where Section H is used. See footnote to Section H
67 Project-specific selection of appropriate definition depending on whether phasing is used and whether there is significant commissioning activity post Actual Completion and prior to full service delivery.
68 Suggested to be the 1 April prior to anticipated Financial Close
69 If Phasing is used
70 Dependent on scope of Services. See paragraph 1 of Section F.
71 Significant overlap with Outline Commissioning Programme and provisions for Clinical Clean, Staff Transfer, etc. See Section C, Paragraph 2. Length of reasonable bedding-in period will be project-specific.
72 To be amended if "Payment Commencement Date 1" is not used - where there is no phasing
73 Project specific reference to geographical area
74 Align wording with Part 14 of the Schedule.
75 Boards to ensure that Part 14 of the Schedule details every situation that Project Co is expected to Rectify.
76 Projects may want to use this definition and associated relief in Section C, Paragraph 1.3.2, if there is not a requirement to provide robust on-site back-up of services such as electricity generation, dual fuel boiler firing and water storage. Where back ups are required, then no relief for External Utility Failure should be required.
77 May be either the month in which the Base Date falls (giving 10 months indexation in the first year), or the month two months prior to the month in which the Base Date falls (giving 12 months inflation in the first year). Seek advice from Financial Advisor
78 If Phasing is used, should relate to the Commissioning End Date for the final Phase
79 Projects may want to consider a Joint Operating Protocol which sets parameters for reasonable user behaviour in the use of energy, and establishes a Joint Utilities Management Group to provide a forum for discussion and agreement of energy principles. See Section F Paragraphs 3 and 5.
80 Projects should use calibration modelling with its advisors to evaluate the value for money and incentivisation delivered by unavailability and performance deductions - see Scottish Government Guidance on Payment Mechanisms. PFCU may consider a "per event" approach to minimum unavailability deductions as opposed to this "per unit" approach if projects demonstrate a value for money case.
81 Dependent on scope of Services. See paragraph 1 of Section F.
82 Definition required if handover is phased. Insert number of phases and percentages as required
83 Boards may wish to specify Prescribed Health Functions and Prescribed Operational Functions by reference to an explanatory table which could be appended to the Payment Mechanism or to the relevant room data sheet.
84 Only required if activities carried out by the Board are required prior to Board use (e.g. setting of cultures to determine sterility) - See Section C paragraph 7
85 A revised format of Service Level Specification (Part 14 of the Schedule) is required to support this wording with a column specifying, for each service standard that does not have a Rectification Time, when a failure is recorded, the length of the remedial period, and what constitutes remedy. Contact PFCU for precedent material.
86 It is likely that "emergency" reactive requests under some Services would necessarily lead to Unavailability. Unavailability deductions and Service Failure Points accrue in units of Sessions whereas Performance Failure related deductions and Service Failure Points accrue in units of the Rectification Time. Some clarity in this definition may be required to make specific reference to any performance parameters whose failure will necessarily lead to unavailability.
87 Review list on a project specific basis
88 List of elements will depend on whether Section H is applicable.
89 Service-specific
90 Project-specific Area reference