PART 21 OF THE SCHEDULE: INSURANCE REQUIREMENTS
>
Section 1 Policies to be taken out by Project Co and maintained during the [design and construction phase].
>
1. Contractors' 'All Risks' Insurance (CAR)
>
1.4 Maximum Deductible
1.4 Maximum Deductible
£ [ ]