PART 21 OF THE SCHEDULE: INSURANCE REQUIREMENTS
>
Section 1 Policies to be taken out by Project Co and maintained during the [design and construction phase].
>
2 Delay in Start Up Insurance (DSU)
>
2.6 Period of Insurance
2.6 Period of Insurance
As per the
Contractors
' "All Risks"
Insurance
, excluding the defects liability period.